The Rock Creek Tennis Center is situated at the headwaters of Blagden Run, a tributary to Rock Creek and ultimately the Potomac River. The 26-acre site boasts 25 tennis courts, a 7,500-seat stadium, a 3,700-seat amphitheater, and a great deal of pavement. Developed before the District enacted its stormwater regulations, the Center experienced uncontrolled, concentrated storm flows from these impervious surfaces. Over time, the stormwater carved eroded gullies in the surrounding forest, lowered infiltration and groundwater tables, and degraded habitat of native protected species. So severe was the site’s environmental degradation, it was identified as a priority restoration area by the U.S. Fish and Wildlife Service and the National Park Service due to its impact on habitat along Rock Creek.
To help the District Department of Energy and Environment restore Rock Creek’s natural hydrology, prevent gully erosion, reduce stormwater pollution, and restore habitat, Biohabitats provided design-build services to retrofit more than seven acres of impervious surface with Green Infrastructure. The retrofit involved creating eight bioretention basins, sub-soiling compacted fields, disconnecting impervious surface with a level spreader, and installing in-channel stabilization structures in seven outfall channels. Biohabitats was the prime contractor for this design-build effort, with Triangle Contracting leading construction implementation.
As it functions to manage stormwater and enhance habitat, the green infrastructure also adds beauty and elements of connectivity to the site’s park environment. The project was awarded “Best Retrofit in the Bay” by the Chesapeake Bay Stormwater Network.
TAGS
Owner: National Park Service
Bioregion: Chesapeake/Delaware Bays
Ecoregion: Chesapeake Rolling Coastal Plain
Physiographic province: Piedmont
Watershed: Rock Creek-Potomac River
Collaborators: ER&M, Triangle Contracting, Casey Trees